Skip to main content

Canada: LINK 427 wins Ontario’s Highway 427 Expansion contract

LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province. The LINK team consists of ACS Infrastructure Canada, Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering. The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7. Work includes building thre
March 16, 2017 Read time: 2 mins
LINK 427 has been selected for the US$457 million design, build, finance and maintain contract for the Highway 427 Expansion project in Ontario province.

The LINK team consists of 917 ACS Infrastructure Canada, 4761 Dragados Canada, Bot Infrastructure, Brennan Infrastructures, MMM Group and Thurber Engineering.

The project, in the Toronto area, includes a new 6.6km extension of Highway 427 from Highway 7 to Major Mackenzie Drive and widening of 4km from Finch Avenue to Highway 7.

Work includes building three interchanges and median high occupancy toll lanes. The project is expected to start later this year and wrap up in 2021.

Highway 427 - a 400-series highway - connects the Queen Elizabeth Way (QEW) and Gardiner Expressway with Highway 7 by way of Highway 401. It is Ontario's second busiest freeway by volume – around 300,000 vehicles daily - and third busiest in North America, behind Highway 401 and Interstate 405 in California.

Some of the route is divided into a collector-express system with 12-14 continuous lanes and there are several multi-level interchanges. The junctions with QEW and Highway 401 are two of the largest interchanges in Ontario and were constructed between 1967-71.

Highway 427 is also the main feeder to Toronto Pearson International Airport.

Meanwhile, ACS, has completed nearly $269 million of financing for work within the LINK consortium for construction and operation of Highway 427.

For more information on companies in this article

Related Content

  • Galliford Try aims to downsize its construction business
    April 25, 2019
    UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
  • Acrow supplies temporary bridge during Turcot Interchange project
    June 28, 2018
    Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int
  • Bidding is healthy for a contract for the I-77 Interstate highway in the US state of North Carolina with Spanish firms competing
    April 4, 2012
    Bidding is healthy for the I-77 Interstate highway project in the US state of North Carolina. This 47km highway runs from the city of Charlotte to Mooresville and the contract will be for a 50 year period. Spanish construction companies ACS, OHL and Ferrovial are all amongst the bidder for the US$501.5 million package, which includes construction, maintenance and. French firm Vinci has formed a partnership with US companies Parsons, Archer Western and Blythe Construction. ACS has ACS formed a consortium wit
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect