Skip to main content

Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium

The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
April 17, 2015 Read time: 2 mins
The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin.

The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion.

The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project will replace an ageing bridge, will link Montreal to the St Lawrence River's south shore and should generate 30,000 jobs. Work is expected to start this summer for completion in December 2018, according to a statement by federal infrastructure minister Denis Lebel who made the contract award in Montreal. SNC beat two other bidders for the work.

The bid requirements for the Champlain Bridge contract stipulated that no company, affiliate or member of a board of directors could have been convicted of a criminal offence in order for their consortium to qualify.

Because of this, the awarding of the deal by the Federal Bridge Authority to SNC Lavalin, is controversial. The Globe and Mail %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal newspaper reported Globe and Mail report false http://www.theglobeandmail.com/report-on-business/snc-lavalin-shakes-up-senior-management-team/article23965219/ false false%> that SNC was charged in February with corruption and fraud over alleged criminal acts that occurred between 2001 and 2011 while it did business in Libya. But SNC has said the acts were committed by former employees who have since left the company and that the corporation itself should never have been charged.

The Globe also said that the SNC’s infrastructure business unit, which includes projects like hospitals, mass transit and water treatment plants, has posted losses on earnings before interest and taxes for the past two years. SNC announced this week it will replace the executive in charge of the business.

2482 SNC Lavalin will announce its first quarter result on May 7.

For more information on companies in this article

Related Content

  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • VIDEO: Get me to the church on time, and fast
    November 12, 2015
    God willing, two nuns in northern Slovakia caught on camera speeding managed to get home, or to the church, safely and on time. The sister, accompanied by another nun, was pushing her Skoda Fabia with religious conviction to around 160kph, or 100mph. However, they haven’t been the fastest nuns around Europe in recent years. In 2009, a nun in Italy, near Turin, was stopped by police for nudging upwards of 180kph – 110mph. The UK’s Daily Mail newspaper reported at the time that “demon driver Sister T
  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
  • Manitowoc MLC650 cranes keep Champlain Bridge on track
    October 28, 2016
    Two Manitowoc MLC650s are working on a project to replace the Champlain Bridge that spans the Saint Lawrence River in Montreal, Canada. The engineering consortium - Signature on the Saint Lawrence Construction (SSLC) – is assigned to the task. The capacity and reduced ground preparation made possible by the MLC650’s VPC-MAX attachment – as well as the ease of use of its Crane Control System (CCS) – are helping the team stay on schedule. The Champlain Bridge connects one of North America’s busiest road