Skip to main content

Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium

The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
April 17, 2015 Read time: 2 mins
The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin.

The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion.

The consortium called Signature on the Saint-Lawrence Group includes Spanish firms 4761 Dragados Canada and 917 ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project will replace an ageing bridge, will link Montreal to the St Lawrence River's south shore and should generate 30,000 jobs. Work is expected to start this summer for completion in December 2018, according to a statement by federal infrastructure minister Denis Lebel who made the contract award in Montreal. SNC beat two other bidders for the work.

The bid requirements for the Champlain Bridge contract stipulated that no company, affiliate or member of a board of directors could have been convicted of a criminal offence in order for their consortium to qualify.

Because of this, the awarding of the deal by the Federal Bridge Authority to SNC Lavalin, is controversial. The Globe and Mail %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal newspaper reported Globe and Mail report false http://www.theglobeandmail.com/report-on-business/snc-lavalin-shakes-up-senior-management-team/article23965219/ false false%> that SNC was charged in February with corruption and fraud over alleged criminal acts that occurred between 2001 and 2011 while it did business in Libya. But SNC has said the acts were committed by former employees who have since left the company and that the corporation itself should never have been charged.

The Globe also said that the SNC’s infrastructure business unit, which includes projects like hospitals, mass transit and water treatment plants, has posted losses on earnings before interest and taxes for the past two years. SNC announced this week it will replace the executive in charge of the business.

2482 SNC Lavalin will announce its first quarter result on May 7.

For more information on companies in this article

Related Content

  • North Marmara Motorway connecting roads tenders postponed again
    September 2, 2015
    Tenders for construction of connecting roads for Istanbul's third bridge over the Bosporus have been postponed for the fourth time. A tender for the Kurtkoy-Akyazi motorway tender will be held on March 1 next year with that for the Kinali-Odayeri road will be held a week later, the Dünya Gazetesi newspaper reported. The tenders will be held as part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. Completion of the connecting roads is plan
  • VIDEO: London’s Silvertown Tunnel gets approval
    October 13, 2016
    A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

    The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

    London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    June 26, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region. At its first ERF biennial Symposium on Road Infrastructure Challenges in June, more than 100 stakeholders heard the ERF demand the “ope
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    August 31, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap