Skip to main content

Cameroon road construction project commencing

A key road construction project in Cameroon is now commencing.
By MJ Woof May 26, 2020 Read time: 1 min
Work is being carried out to improve a road connection in Southern Cameroon - image © courtesy of Rosevite2000, Dreamstime.com


Work is starting on an important road link in Cameroon. An Italian contractor, ICM-Construction, is handling the project.

The plan is to improve the 179km route connecting Kribi, on the coast in South Cameroon, with Ebolowa, which lies inland. This road project is costing an estimated US$225.6 million.

Funding is being provided by the Standard Chartered Bank as well as the UK export credit agency, UKEF. Improving this road link is expected to take three years to complete.

The town of Ebolowa is the capital of Cameroon’s South Region. Meanwhile Kribi is a busy resort town in the south of the country. Improving the road link will help develop the country’s tourist trade.

Related Content

  • Tunisia: Kairouan-Sousse motorway tender due in September
    March 18, 2015
    The invitation to tender for the Kairouan-Sousse motorway will be issued in early September, according to Tunis Afrique Press. Mohamed Salah Arfaoui, the Tunisian Minister for Infrastructure, Housing and Territorial Development, made the announcement, saying that the project is expected to cost around US$70 million. Financing will be aided by the World Bank, he added. Meanwhile, construction started in November on the last part of the Trans-Sahara Highway connecting the Algerian capital Algiers to the Niger
  • Road and bridge upgrades improving transport in Nepal
    November 1, 2019
    New road and bridge upgrades are being introduced in Nepal that will help improve transport and develop the country’s economy.
  • Chinese contractor wins major Nigerian road project
    November 11, 2013
    A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. Its route runs from the
  • Ethiopia races on with projects
    June 13, 2012
    Ethiopia is pursuing a 10-year $2.4 billion development plan, part of which are ambitious road developments. Shem Oirere reports Ethiopia is hastening its pace towards accessing a share of the East Africa commodity market and opening itself up for foreign investment through the implementation of an ambitious road development strategy, the Road Sector Development Programme (RSDP). The landlocked nation has convinced a number of international lenders of the viability of RSDP, with some of them now loosening