Skip to main content

Cameroon road construction project commencing

A key road construction project in Cameroon is now commencing.
By MJ Woof May 26, 2020 Read time: 1 min
Work is being carried out to improve a road connection in Southern Cameroon - image © courtesy of Rosevite2000, Dreamstime.com


Work is starting on an important road link in Cameroon. An Italian contractor, ICM-Construction, is handling the project.

The plan is to improve the 179km route connecting Kribi, on the coast in South Cameroon, with Ebolowa, which lies inland. This road project is costing an estimated US$225.6 million.

Funding is being provided by the Standard Chartered Bank as well as the UK export credit agency, UKEF. Improving this road link is expected to take three years to complete.

The town of Ebolowa is the capital of Cameroon’s South Region. Meanwhile Kribi is a busy resort town in the south of the country. Improving the road link will help develop the country’s tourist trade.

Related Content

  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
  • New bridge planned to link Senegal and Mauritania
    July 16, 2018
    A new bridge link is being planned intended to boost transport between Senegal and Mauritania.
  • Highway construction to be completed for South East Nigeria
    June 11, 2018
    Further financing will be required to complete construction work for Nigeria’s vital East-West highway project. Work is being carried out on sections of the highway between Warri and Port Harcourt and from Eket to Ikot Akan and Atan Ikpe. The former stretch is being handled by Setraco Nigeria, while the latter is being handled by Reynolds Construction Company. However a further US$277.4 million will be required to fund the work, which involves widening the highway so that it features two lanes in either dir
  • New Vietnamese expressway projects
    April 18, 2023
    New Vietnamese expressway projects are planned.