Skip to main content

California connection construction contract

The contract to widen a key section of one of Northern California’s most congested highways has now been awarded. The US$107 million package of works will see the building of a new carpool and express lane along a 14.5km stretch of Interstate 680 in the Bay Area. The lane will be built along the northbound stretch of the highway between the Auto Mall Parkway and Highway 84. The southbound express lane will also be upgraded. Construction on this section is being funded by local sales taxes and the work is
December 1, 2017 Read time: 2 mins

The contract to widen a key section of one of Northern California’s most congested highways has now been awarded. The US$107 million package of works will see the building of a new carpool and express lane along a 14.5km stretch of Interstate 680 in the Bay Area. The lane will be built along the northbound stretch of the highway between the Auto Mall Parkway and Highway 84. The southbound express lane will also be upgraded. Construction on this section is being funded by local sales taxes and the work is due to start in early 2018. An additional section could also be built to extend the extra lane to Highway 237 in 2021 if further funding is secured. The package of works was awarded by the Alameda Transportation Commission and the project is intended to reduce journey times for drivers along the route, which suffers long delays at peak periods.

Related Content

  • South Eastern Nigerian road project stalls
    July 24, 2019
    Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • Pearl Harbor Memorial Bridge, an extradosed design, opens in Connecticut
    September 30, 2015
    The first extradosed designed bridge in the United States, the Pearl Harbor Memorial Bridge in New Haven, Connecticut, was opened to traffic on September 28.