Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Polish projects to go to tender
    October 12, 2018
    A series of important Polish road projects will be opening for tender shortly. In all the nine projects will be worth €603.3 million and stretch for a total of 138km. These project tenders will be announced by e Polish General Directorate for National Roads and Motorways (GDDKiA) before the end of 2018. The work includes improvements to the DK 18 National Road as well as ring roads for the cities of Nowy Sacz, Ostrowiec Swietokrzyski, Zawiercie and Poreba.
  • Albania prequalifying for bypasses around Vlore and Fier
    October 5, 2017
    Albania is pre-qualifying contractors for two major bypass projects, according to the European Bank for Reconstruction and Development. One is for construction of a 29km bypass of the southern Adriatic port city of Vlore with work expected to take 27 months. Vlore, with a population or around 130,000, is the country’s third largest city.
  • Tunisia’s Sfax-Gabès and Oued Zarga-BouSalem projects ready in 2016
    September 2, 2015
    Tunisia’s minister for infrastructure and housing, Mohamed Salah Arfaoui, has announced that the Sfax-Gabès and Oued Zarga-BouSalem motorways will be operational in summer 2016. On a visit to Médenine, he announced that other motorways would be commissioned by 2018, bringing the total network to 1,000km. Tunisia is expected to put out to tender the Kairouan-Sousse motorway this month, according to a report in March by Tunis Afrique Press. Arfaoui said at the time that the the Kairouan-Sousse motorway
  • Romanian road tenders underway
    October 5, 2022
    Romanian road tender processes are now being carried out.