Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • TISPOL European speeding crackdown nets 120,000 tickets in 24 hours (Video)
    April 28, 2015
    The first pan-European 24-hour speeding enforcement crackdown resulted in police issuing more than 120,000 penalties. TISPOL, the European Traffic Police Network based in London, UK, said the “marathon” took place earlier this month and so far 17 out of 22 participating countries have provided data. A total of 4,352,234 vehicles were checked during the 24 hours. Of the 122,581 speeding offences, 116,479 were detected by police officers, with 6,102 detections using automatic devices. Police in Germa
  • Czech D35 section deal for Mott MacDonald
    April 23, 2024
    PricewaterhouseCoopers, Mott MacDonald, White & Case and SIEBERT + TALAŠ are part of the winning consortium for the Mohelnice-Opatovec stretch.
  • Polish dual carriageway under construction
    June 20, 2018
    Work is underway in Poland on the S1 dual carriageway that will connect the country with neighbouring Slovakia. The project is costing €1.17 billion and the new link should be ready for traffic in 2023. The tender process is underway for one of the sections at present with the bids being reviewed for the stretch linking Pryzbedza and Milowka.
  • Strabag secures US$2.23billion Italian motorway build project
    March 14, 2012
    The US$2.23billion (€1.7billion) contract to build the Pedemontana Lombarda motorway in northern Italy has been won by the Strabag consortium.