Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Morocco tender
    April 24, 2012
    The authorities in Morocco are now assessing 13 bids submitted in the tender for a new highway between El Jadida and Safi. The 141km road will cost some US$640 million to build. The project will be divided into four sections, the 20.6km El Jadida-Jorf Lasfar stretch, the 39.2km Jorf Lasfar-Sidi Smail stretch, the 38.85km Sidi Smail-Oualidia stretch and the 43.5km Oualidia-Safi stretch. The road will include six junctions and a toll barrier. The contract will be divided between the winning operators selected
  • STRABAG wins Hungarian expressway contract
    December 20, 2017
    STRABAG has won the tendering process for a €125 million expressway construction contract in Hungary. The package of works is for the construction of the R76 expressway in western Hungary. The contract will involve building an 8.6km section of expressway along with a number of overbridges and will take 36 months to complete. The work is being carried out for the state-owned firm NIF Zrt. This will be the first section of the R76 expressway, running from Zalaegerszeg to the M7 motorway and the work will incl
  • FIEC aims to tackle lowest possible cost bidding
    February 28, 2012
    The FIEC, the European construction industry federation, aims to end unfair competition by state-owned and state-aided enterprises across the globe.
  • €4.3 billion Polish road plan for 2024
    July 8, 2024
    Poland has set out a €4.3 billion road development plan for 2024.