Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • €944.7 million for Czech highway links
    January 10, 2025
    €944.7 million being spent for for Czech highway links.
  • Vinci handling UK junction contract
    December 16, 2016
    Contractor Vinci Construction looks set to handle a major road junction improvement scheme in the UK, although the final permission process has yet to be achieved for the work. The project requires the construction of a new junction on the M20 motorway in Kent, close to Ashford. The new junction 10a will be located around 700m from the existing junction 10a, but will feature significant improvements in its design so as to boost capacity. Congestion is a major problem for the existing junction so the £39 mil
  • Lithuania highway work due
    November 10, 2022
    Lithuania highway works are due.
  • Action call for ''Britain's worn-our road markings''
    March 2, 2012
    Nearly a third of the length of Britain's single carriageway A roads have white lines so worn out that they do not meet recognised standards, according to the LifeLines Report, an assessment of more than 2,400km miles of the network.