Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Another Czech D6 tender due this autumn
    May 16, 2024
    Work on the section that will connect Bošov with Knínice will cost around €170 million.
  • Road Safety Foundation: low-cost road safety improvements pay off
    December 3, 2014
    A major speed limit review in the county resulted in the speed limit be reduced from around 65kph (40mph) to 48kph (30mph) on two short sections through the town of Amersham.
  • Romania to build wildlife bridges over the A1
    June 17, 2019
    Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
  • Poland commits to more S17 work, including Chelm bypass
    September 25, 2017
    Poland has approved financing for two road projects worth nearly €1.2 billion in total, including a ring road around Chelm. The Ministry of Infrastructure and Construction said there will also be dual carriageway section for the S17 between Piaski and Hrebenne.