Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Construction to start on Hungary’s revamped M4 project in 2016
    July 7, 2015
    The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.
  • Last section of Osman Gazi Bridge lifted into place over Izmit Gulf
    May 4, 2016
    The last section of the 3km İzmit Bay Bridge – now officially the Osman Gazi Bridge - was lifted into place on April 21, according to Turkish media. When open later this summer, the bridge will cut the 70-minute drive around İzmit Gulf, on the Sea of Marmara, to just six minutes.
  • Major German road contract awarded
    September 2, 2020
    A major road contract has been awarded close to Hesse in Germany.