Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Polish highway contract
    March 1, 2012
    A new contract has been awarded in Poland to construct a 40km section of the A1 highway.
  • Many bidders for key Polish dual carriageway works
    October 15, 2013
    Great interest has been shown in tenders advertised by GDDKiA to build three sections of the S3 dual carriageway in Poland. A total of 18 bids were received from firms and consortia for the first section, which measures 14.4km and extends from the Kazmierzow junction to Lubin North. The other two sections, from the Lubin North junction to the Lubin South junction (11.3km) and from Lubin South to the Legnica II junction (22.6km), both attracted similar bidders to the first tender.
  • Ustronie Morskie junction to the ring-road of Koszalin
    November 3, 2015
    Strabag consortium has signed a contract with the Polish General Directorate for National Roads and Motorways (GDDKiA) for construction of an S6 dual carriageway section. The work, worth around US$113 million, is due for completion in April 2019. It also makes Strabag responsible for more than 100km of S6 work. The latest section is from the Ustronie Morskie junction to the ring-road of Koszalin and Sianow. Before the entire S6 route is completed, a contract for Kolobrzeg-Ustronie Morskie section m
  • Poland: €7.57bn road budget call
    February 20, 2012
    The Polish highway authorities are calling for a road budget of e7.57 billion for 2011, and while this will have to be approved by the government, it is some e1.56 billion lower than originally planned.