Skip to main content

Budimex and Strabag win 16km of Poland’s four-lane A1

Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
August 6, 2018 Read time: 1 min
3302 Budimex and 945 Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów.


The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months.

The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.

“The A1 in Poland is an important link between the ports in the north of the country and the south of Europe. We are pleased to have again received an order for a section in the course of the expansion of the A1,” said Thomas Birtel, chief executive of Strabag.

For more information on companies in this article

Related Content

  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
  • Polish highway contract
    March 1, 2012
    A new contract has been awarded in Poland to construct a 40km section of the A1 highway.
  • Polish road tender process underway
    November 8, 2019
    The tender process is underway again for a 24km stretch of road in Poland. Motorways (GDDKiA). Offers have so far been received by Budimex, Unibep, Porr and Polaqua, with the lowest bein
  • Poland’s next A2 motorway section to cost €348million
    January 21, 2019
    Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol