Skip to main content

Budimex and Strabag win 16km of Poland’s four-lane A1

Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
August 6, 2018 Read time: 1 min
3302 Budimex and 945 Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów.


The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months.

The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.

“The A1 in Poland is an important link between the ports in the north of the country and the south of Europe. We are pleased to have again received an order for a section in the course of the expansion of the A1,” said Thomas Birtel, chief executive of Strabag.

For more information on companies in this article

Related Content

  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
  • Poland: Budimex signs Olsytyn city ring-road contract
    April 4, 2016
    Budimex has signed a contract worth more than €214.3 million for construction of the second section of Olsztyn's ring-road. The section will be around 14.7km long and will be completed within 28 months. The bid by Budimex was the fourth lowest offer in the tender, as announced by the Polish General Directorate for National Roads and Motorways (GDDKiA).
  • Strabag reports output volume remained flat for year end 2014
    February 16, 2015
    Austrian construction giant Strabag reported output volume of €13.6 billion to year end 2014 was unchanged from last year. The publically listed group, with headquarters in Vienna, said declines in contracts in some countries were offset with increases in the home markets of Germany and Austria, despite a “very restrained tender award policy” for the public sector. Large projects were completed in Romania and Russia at the same time that newly acquired orders in these markets have not yet come on stream.
  • Czech Republic highway deal for consortium
    October 8, 2020
    A highway deal in the Czech Republic will be handled by a consortium.