Skip to main content

Budget for Russia-China road links

Plans are being drawn up in Russia for the road links that will connect with Western China. The work will include rebuilding existing links as well as building new roads, with completion expected by 2024. Four separate road projects are being prioritised. One route will include a highway through Kazan while another will see the construction of a new tolled highway.
September 10, 2018 Read time: 1 min

Plans are being drawn up in Russia for the road links that will connect with Western China. The work will include rebuilding existing links as well as building new roads, with completion expected by 2024. Four separate road projects are being prioritised. One route will include a highway through Kazan while another will see the construction of a new tolled highway.

Related Content

  • Costa Rica road project facing challenges
    April 28, 2021
    An important Costa Rican road project is facing serious challenges.
  • Russia's new road link
    April 20, 2012
    Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.
  • A new Malaysia-Indonesia link
    September 29, 2022
    A new Malaysia-Indonesia road link is being planned.
  • Serbia speeding spending on roads
    May 21, 2014
    Serbia is planning to speed construction of its highway network. A key project being prioritised is the Corridor 10 motorway, which is due for completion by September 2016. Another priority project is for Corridor 11 and for several regional road routes. At present the Corridor 10 sections between Sid and Belgrade, and Subotica and Belgrade have been built, while work on the 22km Ipsilon stretch between Subotica and Kelebija is underway. Work is also underway on the 96km south node from Grabovnica to Presev