Skip to main content

Brazilian road project faces concerns

A key Brazilian road project faces serious concerns.
By MJ Woof August 28, 2020 Read time: 1 min
An expressway project in Brazil is facing scrutiny – image courtesy of © Zimmytws, Dreamstime.com

Concern is being expressed in Brazil with regard to an important road project planned for Santa Catarina State. The work is being managed by the Brazilian road firm, Arteris. The Contorno Viario de Florianopolis project is for a 59km stretch of expressway. But Brazil’s Auditors Court (TCU) is expressing concern over the cost of the US$964.2 million project.

When the new expressway is built, it will reduce congestion on a stretch of the BR 101, which currently suffers from congestion and traffic delays. The concerns over the cost mean that the project is facing extra scrutiny at present.

Related Content

  • US$905 million loan for Philippines road
    January 29, 2025
    A US$905 million loan for a Philippines road project
  • Delays for key Brazilian road projects
    March 3, 2016
    A series of major road projects in Brazil now look set to be delayed. Key road widening projects works awarded between 2012 and 2013 may now take longer than the original five year deadline to complete. Six road concession projects were awarded in the period, totalling over 3,000km of roads to be extended or upgraded. The contracts require that at least 10% of the planned work must be complete before any tolls can be charged. This initial phase has been carried out, but later stages to expand the roads have
  • Egis expands in Brazil with acquisition of Lenc
    November 28, 2014
    French engineering firm Egis has expanded further into the Brazilian infrastructure market with the purchase of highways contractor Lenc for an undisclosed sum. A statement from Egis said the acquisition is part of a strategy to expand aggressively in Brazil that it has been focusing on since 2011. Lenc, established in Sao Paulo in 1975, has 450 employees whose road building work ranges from preliminary studies and project management to work supervision and inspection. It also operates nearly 2,500km
  • Brazil: Rate of return for upcoming road tenders set at 9.2%
    July 16, 2015
    Brazil's Treasury Ministry has confirmed that the rate of return for the upcoming highway concession auctions is to be set at 9.2%, up from the 7.2% used in the previous round of tenders in 2013. The lower return is to ensure that the road tolls are lower. However, critics said the measure is not high enough and many contractors are looking for a rate of return of at least two digits, Brazil media reported. Even the increased rate as it stands will not lead to a greater number of contractors tendering fo