Skip to main content

Brazil: Rate of return for upcoming road tenders set at 9.2%

Brazil's Treasury Ministry has confirmed that the rate of return for the upcoming highway concession auctions is to be set at 9.2%, up from the 7.2% used in the previous round of tenders in 2013. The lower return is to ensure that the road tolls are lower. However, critics said the measure is not high enough and many contractors are looking for a rate of return of at least two digits, Brazil media reported. Even the increased rate as it stands will not lead to a greater number of contractors tendering fo
July 16, 2015 Read time: 2 mins
Brazil's Treasury Ministry has confirmed that the rate of return for the upcoming highway concession auctions is to be set at 9.2%, up from the 7.2% used in the previous round of tenders in 2013.

The lower return is to ensure that the road tolls are lower. However, critics said the measure is not high enough and many contractors are looking for a rate of return of at least two digits, Brazil media reported.

Even the increased rate as it stands will not lead to a greater number of contractors tendering for business.

Paulo Correa, from the Treasury Ministry, said that the figure represents the weighted average cost of capital and not truly an estimate of return for the projects, which will depend on a number of other factors.

Correa also noted that the increase will have little affect on road users and not cause a significant rise in road tolls.

The new measure is to be applied to the four highway stretches planned to be tendered in 2015.

Also announced was the toll for the first road project to be offered in the new concession packet, around US$4.40, according to studies from the government’s technical division. The value is almost three times that of the current average toll charged for the most recent Brazilian highway concessions.

Meanwhile, the government is consulting the public until next month on the toll for a new road between the city of Chapeco in the state of Santa Catarina and the city of Curitiba in the state of Parana – both in southern Brazil.

Related Content

  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • Key deals show strength of Tolling solutions sector
    September 26, 2013
    The world’s leading tolling solution providers have achieved significant deals in recent months emphasising the importance of their latest and proven technology. Guy Woodford reports Kapsch TrafficCom North America (Kapsch), part of Kapsch TrafficCom Group, has been awarded a five-year US$30 million contract by Canadian Tolling Company International (Cantoll). The contract will see the leading tolling technology manufacturer supply its next generation TDMA V6 Interior Transponder, also known as an onboar
  • Brazilian highway tender planned
    July 24, 2023
    A Brazilian highway tender is being planned.
  • ARTBA provides detailed analysis of US transportation investment
    July 2, 2013
    The latest American Road & Transportation Builders Association (ARTBA) analysis of US Census Bureau data reveals a 6% decline in the real value of highway pavement work. This contrasts with investment in airport, rail, transit, port and waterway construction in the US. Contractors completed US$8.4 billion in pavement construction work between January and April 2013, compared to $8.9 billion during the same time period in 2012 according to the report. Bridge and tunnel work between January and April 2013 was