Skip to main content

Brazil launches Projeto Crescer privatisation plan

Motorways are among the 25 infrastructure projects that Brazil’s new president, Michel Temer, intends to privatise in an attempt to revive the flagging economy. Other projects in the Projeto Crescer - Project Growth – plan include airports, rail lines, sewage systems, energy distributors and gas and oil fields. All the projects should be in majority private hands by 2018, he said during the announcement. “We will increasingly show that the government cannot do everything. We need to have the presen
September 21, 2016 Read time: 3 mins
Brazil seeks greener infrastructure pastures
Motorways are among the 25 infrastructure projects that Brazil’s new president, Michel Temer, intends to privatise in an attempt to revive the flagging economy.

Other projects in the Projeto Crescer - Project Growth – plan include airports, rail lines, sewage systems, energy distributors and gas and oil fields.

All the projects should be in majority private hands by 2018, he said during the announcement.

“We will increasingly show that the government cannot do everything. We need to have the presence of the private sector as a promoter of development and a producer of jobs in the country,” said Temer, who is the former vice-president.

Temer rose to the presidency after Dilma Rousseff was removed from office on charges of illegally shifting government funds between budgets. Temer has promised to pull the economy out of recession by making reforms and attracting foreign investors.

Rio Times newspaper reported that the government’s first projects headed for the auction block are the airports of Porto Alegre, Salvador, Florianópolis and Fortaleza, in the first quarter of next year.

Several federal highways and rail lines will be sold off next year and proposals will be published in English in hopes of attracting much needed foreign investment.

Executive secretary of the Investment Partnership Programme (IPP), Moreira Franco, said the government’s plan is to usher in an era of “maximum technical accuracy”. A project’s capacity to generate returns for investors – and society in general – will be based on solid arithimetic.

“There will be no replacement of arithmetic by ideology,” said Franco. “Return rates and tariffs will be based on technical studies, not the will of president, minister or whomever,” said the official.

Franco said all contracts will have performance indicators to set the quality of service. Investors will know what targets will need to be achieved and how they will be measured.

There will also be an emphasis on only those projects with proven environmental feasibility studies.

Temer’s presidency backed by his centre-right PMDB party ends 13 years of government by Rousseff’s left-wing Workers' Party, the BBC reported. The economy is struggling under a huge budget deficit amid the country's worst recession in 80 years. Brazil's economy contracted 3.8% last year, and is expected to shrink a further 4.3% this year, according to the Organisation for Economic Co-operation and Development (OECD).

According to the Brazilian association of roadworks companies, Aneor, some $2.45 billion is needed to improve, maintain and repair the country’s federal roads/year.

The results from the country’s national transport confederation (CNT) said there was a 13.1% increase in the number of sections of road now in a critical condition, with serious risks to user safety. CNT has stated that it believes that the Brazilian Government should speed up road privatisation projects in a bid to tackle the problem.

Related Content

  • US highway bill finally receives approval by government
    September 27, 2012
    After a long series of delays, the US Government has finally managed to agree the latest highway reauthorisation bill. This comes after numerous short term extensions of the previous bill, due to political stalemate. The short term extensions were not sufficient to allow firms to invest and this situation stunted construction activity in the country. With the bill now in place, contractors will be able to look forward to some transport spending, and will likely increase spending on replacing old constructio
  • Institutional investor demand for private infrastructure set to flourish, says Altius Associates
    April 30, 2013
    Altius Associates (Altius) has tipped institutional investor allocations to private infrastructure funds to grow dramatically over the next decade, either as a stand-alone asset class or as part of a broader real assets allocation. In a new report entitled ‘Infrastructure as part of a global investment portfolio’, Altius states that institutional investors currently have less than 1% allocated to infrastructure, including transport-related infrastructure projects, but it expects this figure to increase to
  • Brazilian conglomerate Odebrecht continues to invest in Peru
    April 27, 2015
    Brazilian conglomerate Odebrecht plans to invest around US$1.5 billion in Peru this year, the company’s head of operations for Peru said. Ricardo Boleira, said has 15 contracts for 2015 and the total value of its operations in the country stands at $13.7 billion. Around $2 billion has been invested in roads, with upwards of $500 million in irrigation projects and $900 million for energy contracts. Odebrecht is a family-owned business started in 1944 and operates in construction, petrochemicals, transp
  • Brazilian highway tender planned
    July 24, 2023
    A Brazilian highway tender is being planned.