Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • PPRS speaker and MEP Cramer will urge more road maintenance
    February 3, 2015
    The chairman of the European Parliament’s transport committee wants an emphasis on road maintenance and finishing international connecting roads systems than on new grandiose highways. If national government’s fail to do this, as it’s their responsibility, then the European Union’s major cities can look forward to increasing gridlock in the coming decades. Congestion and maintenance are first and foremost the responsibility of member states and nobody wants to change this,” said Michael Cramer, chairm
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Cameroon’s massive road expansion and tolled highway
    November 29, 2024
    Cameroon has seen a massive road expansion and will benefit from a new tolled highway.
  • New fuel economy targets could cut motoring costs in Europe
    May 18, 2012
    Europe’s drivers will be able to save enormous sums of money if ambitious fuel economy targets are introduced by the EU this July. This claim has been made by a former UK Environment Agency chief, Malcolm Fergusson. His study predicts that annual fuel costs for Europe’s drivers could fall by about 23% by 2020 if the currently expected EU fuel efficiency target of 95grammes of CO2 emissions/km for new cars and 147grammes/km for vans is confirmed by the European Commission in July, as expected. If the target