Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • LED lighting delivering technical benefits
    April 30, 2015
    A new report from the Lighting Research Center* at Rensselaer Polytechnic Institute focuses on the benefits from switching to LED lighting technologies There is a rapidly changing landscape for roadway lighting worldwide, largely due to the widespread acceptance of light-emitting diode (LED) technology. In developed markets such as the US, this has opened up a universe of new possibilities regarding LED replacement lamps. There are 144 million high-intensity discharge (HID) lamps in the US, representing
  • Pothole problems cause traffic delays
    April 21, 2023
    Pothole problems are a major cause of traffic delays and vehicle damage in many developed nations
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Road pricing could boost UK road investment
    July 4, 2012
    UK road users receive a mere £4 billion in capital investment, and congestion increases. Road pricing could provide the roads needed and reduce taxes, says a new report UK motorists receive a "paltry" £4 billion (€5 billion) investment in road capacity in return for the €57.5 billion a year they contribute in road user taxes, according to the 2008/9 Road File, published by the UK Road Users Alliance (RUA). Over the last decade, this infrastructure spend has led to a minimal 1% increase in the road network t