Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • Ireland's budgert cuts impact on road projects
    May 14, 2012
    Ireland’s government is undergoing a period of belt-tightening, with a string of budget cuts that will directly impact on the transport sector. The country was in the process of spending heavily on its infrastructure but with the tough economic climate it is now facing, a number of road projects are among those facing the axe. The Irish government is slashing its infrastructure spending from €39.6 billion to €22.9 billion between now and 2013. This looks likely to result in 40 road projects, including hig
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Driving recycling, unlocking the value of UK roads
    May 16, 2016
    Concerned about the risk of material failure, many local authorities and network operators have been reluctant to incorporate high recycled content asphalt into the surface course of UK roads. David Smith, development director at FM Conway, explained why asphalt recycling is crucial to maximising the value of Britain’s largely untapped road asset.
  • Major Central American infrastructure projects
    February 23, 2012
    Mexico and Central America are home to some of the world's most spectacular infrastructure projects as Patrick Smith reports