Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • Peru highway concessions face lengthy delays
    January 12, 2015
    Red tape and bureaucracy are to blame for delays to Peru’s highway concessions. Infrastructure association Afin cites these as the reasons the majority of Peru’s highway concessions have been held up, by as much as 10 years in certain instances. Business News Americas reports that so far, only 15% of Peru's 78,000km road network, around 12,445km, is paved according to Afin. The country has a particular need to revamp three major highways according to Afin: the 2,600km Pan- American highway, the 3,500km And
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Transforming Algeria's road network
    February 9, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections.
  • Transforming Algeria's road network
    April 4, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections. Several sections of the new trans-Algerian highway are already complete and carrying traffic, such as the stretch near the town of Setif. When complete the highway will run 1,200km across the north of the country from the border with Morocco in the west to the Tunisian border, passing through 24 provinces. This makes it the biggest highway project ever undertaken in Africa, as wel