Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • Rajasthan Mega Highways boost trade, tourism
    February 17, 2012
    Rajasthan is one of the most favoured tourist destinations of India for both domestic and international traffic on account of its rich array of historical forts, palaces, art and culture.
  • Rajasthan Mega Highways boost trade, tourism
    April 12, 2012
    Rajasthan is one of the most favoured tourist destinations of India for both domestic and international traffic on account of its rich array of historical forts, palaces, art and culture. In terms of area, Rajasthan is the country's largest state. Its size and strategic location means that it is traversed by substantial traffic linking the neighbouring states to the north and south. The National Highway (NH) road corridors currently accommodating this traffic are the NH-8, NH-11, NH-12, NH-14 and NH-1
  • Successful talks for Chile-Argentina tunnel
    August 28, 2014
    Successful talks have been held between Chile and Argentina with regard to the Agua Negra Tunnel that will link the two countries. The project looks set to cost US$1.37 billion to construct, according to Business News Americas. The majority of the planned route, 72%, lies in Argentina and the country will provide the bulk of the funding required; some $986 million. Chile will provide the remaining $384 million. The agreement was struck between the Publics Works Ministries of the two countries. Further detai
  • Two new road links will help boost Uganda’s economy
    October 3, 2014
    Uganda has unveiled plans for the construction of two road projects considered critical in enhancing the integration of the Eastern African economies and boosting the landlocked country's socio-economic performance - Shem Oirere writes The new Rukungiri–Kihihi–Ishasha/Kanungu and Bumbobi-Bubulo-Lwakhakha roads in Uganda feature a design influenced by the desire to harmonise modern road standards in East Africa. These new links will also cater for the current acute shortage of gravel for road construction