Skip to main content

Bosnia’s Autoceste FB&H re-tenders for Pocitelj-Zvirovici project

Bosnia’ public roads authority Autoceste FB&H has re-tendered for construction of 12km of the Pocitelj-Zvirovici part of the Corridor 5C motorway. The work, including the 945m Pocitelj Bridge, is worth around €100million with financing by the European Investment Bank (EIB). A previous tender was called in 2014 when the contract has been awarded to Strabag and Euroasfalt companies, in spite of better offers from Viadukt and Hering, according to media reports.
July 23, 2018 Read time: 1 min
Bosnia’ public roads authority Autoceste FB&H has re-tendered for construction of 12km of the Pocitelj-Zvirovici part of the Corridor 5C motorway.


The work, including the 945m Pocitelj Bridge, is worth around €100million with financing by the 1054 European Investment Bank (EIB).

A previous tender was called in 2014 when the contract has been awarded to 945 Strabag and 5741 Euroasfalt companies, in spite of better offers from 5438 Viadukt and 8004 Hering, according to media reports.

But tenders were dismissed after the EIB had concerns over the publishing of confidential information regarding the tenders.

The latest tender was called in March this year after the best offer has been submitted by a consortium made up of Power Construction Corporation of China and Azvirt. Tender was also attended by Fernas & Ozgun Insaat from Turkey, Euro-Asfalt, Strabag, China Gezhouba Group Company Limited and Cengiz Insaat Sanayi ve Ticaret from Turkey.

For more information on companies in this article

Related Content

  • Slovenia tunnel contract reselection
    December 6, 2018
    The contract for the second drive for the Karavanke tunnel connecting Slovenia with Austria is now once more being tendered. The project was awarded earlier this year to the Turkish contractor, Cengiz Insaat Sanayi Ve Ticaret. However this deal was then annulled and the firm prevented from reapplying. The Turkish company had submitted a bid of €89.3 million for the work. However this had to be rejected as the actual estimate to build the link sets a pricetag of some €121.5 million. The Slovenian road opera
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Turkey bridge connection tenders
    May 9, 2016
    The tender process has been held in Turkey for the construction of connection roads for Istanbul's third bridge spanning the Bosporus. The focus of the road project will be the construction of the 170km Kurtkoy-Akyazi highway. In all eight groups submitted bids, including Cengiz Insaat-Limak Insaat joint-venture (JV), Makyol Insaat, Kolin Insaat-Kalyon Insaat-Hasen Yapi JV, Tekfen Insaat-Dogus Insaat JV, Nurol Insaat-Ozaltin Insaat-Fernas Insaat-Ozgun Insaat JV, STFA Holding- Gulsan Insaat- Yapi Merkezi JV,
  • Bosnia road tunnel project
    December 4, 2020
    A key Bosnian road tunnel project is underway.