Skip to main content

Bosnia Herzogovina highway project receiving EBRD loan

A loan from the European Bank for Reconstruction and Development (EBRD) worth €180 million will help to pay for the construction of the Corridor Vc highway project. This highway is of key importance for the economic development of Bosnia and Herzegovina as it will provide and improved transport connection with Europe. The loan will help to pay for the construction of three new sections of Corridor Vc, measuring some 16km. The loan will be provided in two tranches, with the first of up to €120 million and b
September 12, 2018 Read time: 2 mins
Financing will pay for work to sections of the Corridor Vc highway for Bosnia Herzegovina
A loan from the 1166 European Bank for Reconstruction and Development (EBRD) worth €180 million will help to pay for the construction of the Corridor Vc highway project. This highway is of key importance for the economic development of Bosnia and Herzegovina as it will provide and improved transport connection with Europe.


The loan will help to pay for the construction of three new sections of Corridor Vc, measuring some 16km. The loan will be provided in two tranches, with the first of up to €120 million and being used to co-finance the construction of a motorway section from Poprikusa to Nemila along with the 1054 European Investment Bank (EIB). It will also help pay for construction of Tunnel Ivan. Meanwhile the second tranche 2 of up to €60 million will help to finance the construction of a highway section from the Mostar South Interchange to Tunnel Kvanj.

The loan is expected to be co-financed by an investment grant in the amount of €11.8 million from the European Union, through the Western Balkans Investment Framework (WBIF) which is expected to be approved in December 2018.

The project will improve mobility and traffic safety. The loan is part of a wider commitment following the signing of a Memorandum of Understanding in February 2018 between the EBRD and the Ministers of Transport and Communications of the Federation of Bosnia and Herzegovina and Republika Srpska for an investment programme of over €700 million for the period 2018-2020.

Corridor Vc is a branch of the fifth Pan-European corridor and with a total length of 700 km will connect Hungary and eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea. The longest part of the route goes through Bosnia and Herzegovina, while the road also serves as the shortest connection of the eastern and southern parts of Croatia.

Since the beginning of its operations in Bosnia and Herzegovina the EBRD has invested €2.1 billion in almost 150 projects in the country.

For more information on companies in this article

Related Content

  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • JP Autoceste eyes 2020 as completion date for Bosnia’s Corridor 5c
    March 3, 2016
    Around two-thirds of the Corridor 5c motorway project is expected to be completed by 2020, according to the director of the Bosnian motorways company JP Autoceste. Jasmin Buco said that 120km out of 337km of the motorway are complete. The corridor section, to connect Budapest with Ploce port in Croatia, is taking the most time. He said that the cost of the remaining part of the motorway is expected to be around €2.81 billion.
  • EBRD mulls loan for Macedonian Corridor 8 work
    July 13, 2021
    The €110million (US$ 130.5 million) load would help construct a 10.7km section, including a tunnel, between Bukojcani and Kicevo.
  • Skopje gets EBRD funding for motorway
    July 12, 2022
    The four-lane highway will run parallel to an existing national road built 50 years ago that heads north from the capital Skopje.