Skip to main content

Bosnia gets EBRD loan for Corridor 5c work

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
By David Arminas January 8, 2024 Read time: 2 mins
European Corridor 5c – the backbone of Bosnia’s social and economic prosperity (image courtesy of Motorways of the Federation of Bosnia and Herzegovina - JP Autoceste FBiH)

The EBRD will provide a €110 million loan to Bosnia and Herzegovina for construction of the Mostar North-Mostar South section of pan-European Corridor 5c.

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, the EBRD – European Bank for Reconstruction and Development said in a press release.

As well, the European Union will provide a €150 million grant through the Western Balkans Investment Framework (WBIF) and up to €150 million will be secured from local commercial banks for the project.

The WBIF is a joint initiative of the European Union, financial institutions, bilateral donors and the governments of the western Balkans. It provides financing and technical assistance to strategic investments in the energy , environment, social, transport and digital infrastructure sectors. It also supports private sector development initiatives.

The 700km Corridor 5c starts in the Hungarian capital Budapest, runs via northern Osijek in Croatia, through Bosnia and Herzegovina via Doboj, Zenica, Sarajevo and Mostar to end in the Croatian Adriatric port of Ploče.

According to the WBIF, Corridor 5c is the backbone of Bosnia’s connectivity – it has around 340km of the route – and is strategically vital for its economic development, making it a top priority for the Western Balkans regional development.

Bosnia’s Corridor 5c section is the first major motorway and the largest ever infrastructure project in the country´s history. More than 68km of motorway, including one cross-border bridge, have been supported by EU grants, blended with loans by European Bank for Reconstruction and Development as well as the European Investment Bank (EIB).

When work is done, the WBIF says that a typical journey from Sarajevo to the Adriatic Sea that now takes three and a half hours will be reduced to two hours.

Meanwhile, Bosnian media report that the 5.5km Poprikuše-Nemila section of 5c in Bosnia, originally scheduled for completion in May 2024, has experienced a delay and a significant cost increase. The project was initially contracted for €208 million.

However, the Turkish contractor, Cengiz Insaat, has been granted a further €27.2 million and an extension of 182 days due to unforeseen geophysical conditions encountered during construction.

For more information on companies in this article

Related Content

  • Loans for Georgian roads
    July 20, 2012
    Loans from the European Investment Bank (EIB) and the EU will finance highway work in Georgia. The funds will be used to pay for the construction of the high-speed motor road running from West – East across Georgia. The EIB will give a long-term preferential credit worth €170 million, while the EU will provide a €20 million grant. As part of the project, a four lane highway measuring 52km will be built from Samtrediya – Grigoleti, while the 16km section Grigoleti - Kobuleti stretch will be repaired.
  • Lithuania: EIB to issue loan for Vilnius-Utena A14 highway
    September 21, 2016
    The European Investment Bank (EIB) is looking at issuing a €40 million loan towards reconstruction of Lithuania's Vilnius-Utena A14 highway. According to a notice by the EIB earlier this year, the project includes reconstruction of 58km highway, the main traffic artery between the capital and north-eastern regions of Lithuania. The government intends to procure the project as a public-private partnership under a 13-year concession contract, including a 3-year construction period. The bank noted that t
  • Lithuania loan; funding found for road reconstruction
    September 29, 2016
    Plans to upgrade the Vilnius to Utena highway in Lithuania will now go ahead following the securing of a loan to help pay for the project. The €40 million loan is being sourced from the European Investment Bank (EIB). The loan will be for a period for 12 years, with guarantees being provided by the European Fund for Strategic Investments (EFSI). In all, the work to upgrade the 72.15km A14 route between capital Vilnius and Utena will cost close to €91 million, with the Lithuania Road Administration (LRA) pla
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation