Skip to main content

Bosnia gets EBRD loan for Corridor 5c work

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
By David Arminas January 8, 2024 Read time: 2 mins
European Corridor 5c – the backbone of Bosnia’s social and economic prosperity (image courtesy of Motorways of the Federation of Bosnia and Herzegovina - JP Autoceste FBiH)

The EBRD will provide a €110 million loan to Bosnia and Herzegovina for construction of the Mostar North-Mostar South section of pan-European Corridor 5c.

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, the EBRD – European Bank for Reconstruction and Development said in a press release.

As well, the European Union will provide a €150 million grant through the Western Balkans Investment Framework (WBIF) and up to €150 million will be secured from local commercial banks for the project.

The WBIF is a joint initiative of the European Union, financial institutions, bilateral donors and the governments of the western Balkans. It provides financing and technical assistance to strategic investments in the energy , environment, social, transport and digital infrastructure sectors. It also supports private sector development initiatives.

The 700km Corridor 5c starts in the Hungarian capital Budapest, runs via northern Osijek in Croatia, through Bosnia and Herzegovina via Doboj, Zenica, Sarajevo and Mostar to end in the Croatian Adriatric port of Ploče.

According to the WBIF, Corridor 5c is the backbone of Bosnia’s connectivity – it has around 340km of the route – and is strategically vital for its economic development, making it a top priority for the Western Balkans regional development.

Bosnia’s Corridor 5c section is the first major motorway and the largest ever infrastructure project in the country´s history. More than 68km of motorway, including one cross-border bridge, have been supported by EU grants, blended with loans by European Bank for Reconstruction and Development as well as the European Investment Bank (EIB).

When work is done, the WBIF says that a typical journey from Sarajevo to the Adriatic Sea that now takes three and a half hours will be reduced to two hours.

Meanwhile, Bosnian media report that the 5.5km Poprikuše-Nemila section of 5c in Bosnia, originally scheduled for completion in May 2024, has experienced a delay and a significant cost increase. The project was initially contracted for €208 million.

However, the Turkish contractor, Cengiz Insaat, has been granted a further €27.2 million and an extension of 182 days due to unforeseen geophysical conditions encountered during construction.

For more information on companies in this article

Related Content

  • EU loan for Hungary’s M4 from Budapest to Romanian border
    June 18, 2018
    The European Union will fund €265 million for construction of the last section of the M4 motorway, linking Budapest, Hungary with the Romanian border. The money will come from the EU’s Cohesion Fund that targets projects designed to boost local and regional economies and promote tourism. The link's starting point is at the junction where the M35 motorway, which connects Berettyóújfalu and Debrecen.
  • Loans will help fund Kazakhstan road project
    May 16, 2013
    The International Bank for Reconstruction and Development (IBRD) is providing an infrastructure loan that will help fund a key road project in Kazakhstan. A major portion of this funding will be used to construct a key 79.5km portion of the new international transit corridor connecting Western Europe with Western China. The US$1.07 billion funding package is being provided by the IBRD for 19 years with a five-year grace period and the deal was agreed between the IBRD and the Kazakhstan Government. Further
  • Croatia sea bridge project moving forward
    December 14, 2016
    The authorities in Croatia are pushing ahead with plans for the Peljeski bridge project. The country’s Ministry of Sea, Transport and Infrastructure will apply for funding for the project from the EU, although further hurdles have yet to be cleared. Construction of the 2.4km bridge is expected to cost €373.8 million. Bids for construction of the access roads have already been placed. The bridge is intended to connect the Croatian peninsula of Pelješac to the Croatian mainland. The link would run through Cro
  • UK infrastructure at risk
    February 9, 2017
    The entire infrastructure investment programme in the United Kingdom - Europe’s second biggest economy - is at serious risk as the country begins the process of leaving the European Union “During the next five years, GDP Growth in the UK will be half of what it was in the previous five years,” warned Alexander Jan, a director at UK-based infrastructure designer Arup. The value of the currency will continue to crash and “there will be a doubling in the cost of government borrowing”. This is bad news f