Skip to main content

Bosnia gets EBRD loan for Corridor 5c work

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
By David Arminas January 8, 2024 Read time: 2 mins
European Corridor 5c – the backbone of Bosnia’s social and economic prosperity (image courtesy of Motorways of the Federation of Bosnia and Herzegovina - JP Autoceste FBiH)

The EBRD will provide a €110 million loan to Bosnia and Herzegovina for construction of the Mostar North-Mostar South section of pan-European Corridor 5c.

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, the EBRD – European Bank for Reconstruction and Development said in a press release.

As well, the European Union will provide a €150 million grant through the Western Balkans Investment Framework (WBIF) and up to €150 million will be secured from local commercial banks for the project.

The WBIF is a joint initiative of the European Union, financial institutions, bilateral donors and the governments of the western Balkans. It provides financing and technical assistance to strategic investments in the energy , environment, social, transport and digital infrastructure sectors. It also supports private sector development initiatives.

The 700km Corridor 5c starts in the Hungarian capital Budapest, runs via northern Osijek in Croatia, through Bosnia and Herzegovina via Doboj, Zenica, Sarajevo and Mostar to end in the Croatian Adriatric port of Ploče.

According to the WBIF, Corridor 5c is the backbone of Bosnia’s connectivity – it has around 340km of the route – and is strategically vital for its economic development, making it a top priority for the Western Balkans regional development.

Bosnia’s Corridor 5c section is the first major motorway and the largest ever infrastructure project in the country´s history. More than 68km of motorway, including one cross-border bridge, have been supported by EU grants, blended with loans by European Bank for Reconstruction and Development as well as the European Investment Bank (EIB).

When work is done, the WBIF says that a typical journey from Sarajevo to the Adriatic Sea that now takes three and a half hours will be reduced to two hours.

Meanwhile, Bosnian media report that the 5.5km Poprikuše-Nemila section of 5c in Bosnia, originally scheduled for completion in May 2024, has experienced a delay and a significant cost increase. The project was initially contracted for €208 million.

However, the Turkish contractor, Cengiz Insaat, has been granted a further €27.2 million and an extension of 182 days due to unforeseen geophysical conditions encountered during construction.

For more information on companies in this article

Related Content

  • Renault gets EIB loan for EV R&D
    March 15, 2012
    The European Investment Bank (EIB) has granted a US$237 million loan to the Renault Group to contribute to R&D for a new generation of batteries and motors for electric vehicles.
  • Financial setbacks beset Slovakia’s highway development
    June 12, 2012
    Slovakian highway company NDS says that construction of the 13km Turany-Hubova highway may not be started in 2012. The previous Transport Ministry plan was to call the tender for this stretch in summer 2012. However, the EC has not yet approved the construction of this highway, with questions surrounding the protected area in the Velka and Mala Fatra mountains. If Slovakia does not get this approval, the country might have to chose the second option, which includes the tunnel Korbelka. The EC's decision is
  • Serbian road expansion
    March 21, 2012
    In Serbia some million is being spent on developing the Corridor 10 and 11 highways during 2012. The work being carried out by Serbian roads company Koridori Srbije will include the 22km Ipsilon arm on Corridor 10, which will run from Kelebija to Subotica.
  • Polish projects to get Cohesion Fund cash
    March 6, 2018
    Almost €790 million will be allocated from the Cohesion Fund for three road projects which improve the country's communication with Germany and other Western and Eastern European countries. Around €270 million will be for the Garwolin-to-Kurow S17 dual carriageway, another €125 million to build a stretch of the S6 dual carriageway between Goleniow and Kielp and €390 million for the S2 on the outskirts of Warsaw.