Skip to main content

Bosnia gets EBRD loan for Corridor 5c work

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
By David Arminas January 8, 2024 Read time: 2 mins
European Corridor 5c – the backbone of Bosnia’s social and economic prosperity (image courtesy of Motorways of the Federation of Bosnia and Herzegovina - JP Autoceste FBiH)

The EBRD will provide a €110 million loan to Bosnia and Herzegovina for construction of the Mostar North-Mostar South section of pan-European Corridor 5c.

The project will include the construction of an interchange and a 15 km dual-carriage motorway section, the EBRD – European Bank for Reconstruction and Development said in a press release.

As well, the European Union will provide a €150 million grant through the Western Balkans Investment Framework (WBIF) and up to €150 million will be secured from local commercial banks for the project.

The WBIF is a joint initiative of the European Union, financial institutions, bilateral donors and the governments of the western Balkans. It provides financing and technical assistance to strategic investments in the energy , environment, social, transport and digital infrastructure sectors. It also supports private sector development initiatives.

The 700km Corridor 5c starts in the Hungarian capital Budapest, runs via northern Osijek in Croatia, through Bosnia and Herzegovina via Doboj, Zenica, Sarajevo and Mostar to end in the Croatian Adriatric port of Ploče.

According to the WBIF, Corridor 5c is the backbone of Bosnia’s connectivity – it has around 340km of the route – and is strategically vital for its economic development, making it a top priority for the Western Balkans regional development.

Bosnia’s Corridor 5c section is the first major motorway and the largest ever infrastructure project in the country´s history. More than 68km of motorway, including one cross-border bridge, have been supported by EU grants, blended with loans by European Bank for Reconstruction and Development as well as the European Investment Bank (EIB).

When work is done, the WBIF says that a typical journey from Sarajevo to the Adriatic Sea that now takes three and a half hours will be reduced to two hours.

Meanwhile, Bosnian media report that the 5.5km Poprikuše-Nemila section of 5c in Bosnia, originally scheduled for completion in May 2024, has experienced a delay and a significant cost increase. The project was initially contracted for €208 million.

However, the Turkish contractor, Cengiz Insaat, has been granted a further €27.2 million and an extension of 182 days due to unforeseen geophysical conditions encountered during construction.

For more information on companies in this article

Related Content

  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • Bosnia road tunnel project
    December 4, 2020
    A key Bosnian road tunnel project is underway.
  • Despite earlier contractor issues, road projects in Bosnia are proceeding on track
    May 16, 2012
    Key road construction projects are now moving forward in Bosnia with work on-track for the Sarajevo ringroad as well as the Corridor Vc highway. Construction of a 130km section of the Corridor Vc highway should be complete by 2014 according to Bosnia's Ministry of Transport and Telecoms. Work on the first section of the Sarajevo ringroad should be completed within five months, following the signing of an agreement worth €17 million between the Austrian firm Strabag and the Bosnian company HP Investing. The
  • Bosnia tunnel project; work starting
    November 1, 2019
    Construction work is due to start on the Prenj Tunnel project in Bosnia. The tunnel will form part of the important Corridor 5C route. Measuring 10km in length, the road and tunnel project is expected to cost €820 million to build. Funding is being supplied jointly by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD). The Bosnian Government has also secured a portion of the necessary funding from Bosnian banks. In addition, a contract has been agreed for the