Skip to main content

Bosnia cancels a tender for Corridor 5C, part of European route E73

Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
March 13, 2017 Read time: 2 mins
Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73.

Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km.

Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnevni Avaz. Work will be retendered for parts of the Pocitelj node-Pocitelj bridge and Pocitelj-Zvirovici section.

Terzic said that the tender from 2014 failed several reviews, including one from the European Investment Bank (EIB) which is financing the project. A new tender will be set up likely to be worth around €103 million but he gave no dates.

E73 consists mostly of two-lane roads with at-grade intersections, although in 2000s, around a third of the route was upgraded to motorway standard. The remainder of the route is being upgraded.

Early last year, Autoput FbiH announced that 120km of the 340km is complete and around anouther 100km would likely be completed by 2020.

In mid-2014, a 6km stretch of the highway between Sarajevo and Zenica was opened that included a 3km-loong tunnel. The March 1 tunnel, named after date of Bosnia's independence referendum, meant that the journey between the two cities was cut from one hour to 30 minutes.

The tunnel cost around €62 million had been under construction for several years, first by two Slovenian companies that eventually which went bankrupt, and later by a consortium of Bosnian companies, according to a report by Balkan Insight at the time. The tunnel is the longest in Bosnia and is one of the most important infrastructure projects to be completed since the 1992-5 war.

Related Content

  • Faroes’ Streymoy-to-Sandoy Tunnel opens
    January 23, 2024
    The 10.8km-long Sandoy Tunnel connecting the islands of Streymoy and Sandoy opened in mid-December and is the longest subsea tunnel in the Faroe Islands.
  • New Tisza River bypass bridge to be built at Szolnok, Hungary
    June 28, 2019
    Hungary will soon tender for a new bypass bridge over the Tisza River near Szolnok at a cost of around €77 million. Laszlo Mosoczi, state secretary of the Ministry of Innovation and Technology, said a tender for the planning works is to be called in the autumn with a winner announced in early 2020. The entire project could take five or six years. Szolnok, a town of 72,000 in the Great Hungarian Central Plain 100km east-southeast of the capital Budapest, already has a continuous beam St. Stephen's Brid
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Santiago’s Autopista Central in line for improvements
    June 18, 2015
    Motorway operator Autopista Central de Chile (AC) has applied to the Ministry of Public Works to make improvements worth around US$340 million to the Autopista Central system in the capital Santiago. Improvements are scheduled for the Quilicura area. AC will present an environmental impact and engineering study this summer to the ministry. Much of the work will take place at night time to avoid traffic disruption. Autopista Central consists of two highways, the westernmost of which branches off from t