Skip to main content

Bosnia cancels a tender for Corridor 5C, part of European route E73

Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
March 13, 2017 Read time: 2 mins
Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73.

Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km.

Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnevni Avaz. Work will be retendered for parts of the Pocitelj node-Pocitelj bridge and Pocitelj-Zvirovici section.

Terzic said that the tender from 2014 failed several reviews, including one from the European Investment Bank (EIB) which is financing the project. A new tender will be set up likely to be worth around €103 million but he gave no dates.

E73 consists mostly of two-lane roads with at-grade intersections, although in 2000s, around a third of the route was upgraded to motorway standard. The remainder of the route is being upgraded.

Early last year, Autoput FbiH announced that 120km of the 340km is complete and around anouther 100km would likely be completed by 2020.

In mid-2014, a 6km stretch of the highway between Sarajevo and Zenica was opened that included a 3km-loong tunnel. The March 1 tunnel, named after date of Bosnia's independence referendum, meant that the journey between the two cities was cut from one hour to 30 minutes.

The tunnel cost around €62 million had been under construction for several years, first by two Slovenian companies that eventually which went bankrupt, and later by a consortium of Bosnian companies, according to a report by Balkan Insight at the time. The tunnel is the longest in Bosnia and is one of the most important infrastructure projects to be completed since the 1992-5 war.

Related Content

  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Thailand Government plans infrastructure programme
    November 24, 2015
    Major plans are in hand in Thailand for transport infrastructure development. The country’s Ministry of Transport is revising its construction plans for a series of key transport infrastructure projects at present. Several selected plans will then be presented to the cabinet in mid-December 2015. A total of five public-private partnership (PPP) ventures are among projects that will be re-submitted to the cabinet for approval. Two of these PPP projects are highways that will cost an estimated US$3.9 billion.
  • EIB supporting Finnish PPP highway project
    June 17, 2015
    The European Investment Bank (EIB) is providing financial support for a key Finnish highway project, which will be run on a PPP basis. The EIB is providing a €102 million long-term loan to finance the construction of a 32km highway stretch between Hamina and Vaalimaa in Finland. This section will be built on a public-private-partnership (PPP) basis. Using this model is expected to reduce the construction cost and also shorten the time needed to complete the work in comparison to a conventional procurement p
  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve