Skip to main content

Bidding for Uganda road connecting Kampala and Jinja

In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De
May 22, 2018 Read time: 3 mins
In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the 1073 Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French Development Agency (AFD) and EU. The expressway is to feature from two to four lanes in either direction in various sections and will be a key link on the transport routes for East Africa. This international expressway forms part of the Northern Corridor of the Trans-Africa Highway. It will be the primary transit corridor for transportation of goods to and from Kenya’s port of Mombasa, through Uganda and to the Democratic Republic of Congo, as well as Rwanda and Burundi.


The project has been planned for some time with feasibility studies have been completed some years ago. Construction was intended to start back in 2015. But the tendering process has been delayed for a variety of reasons, including problems with the permissions process for construction on the land along the route.

Building this new expressway will help reduce the severe congestion on the existing route, which is Uganda’s busiest road, improving travel times for drivers. The project includes more than six major interchanges and link roads that will connect to all the major towns along the route. Also included will be the construction of over 60 bridges (such as flyovers and river crossings), fencing along the length of the route, lighting and toll plazas. The new expressway will start at Kakawa Division in eastern Kampala and will run through Namanve and Mukono in Mukono District, ending at the New Jinja Bridge in Njeru. This 525m-long bridge is being built with two lanes in either direction by the Japanese contractor Zenitaka Corporation. The bridge spans the Victoria Nile, replacing a structure dating from the 1950s that has outlived its design life. Construction of the bridge is close to completion and is costing $125 million, with 80% of the funding having been provided by the Japanese Government and the remainder by the Ugandan Government.

And also in Uganda, the new highway connecting capital Kampala with its international airport at Entebbe is now close to completion.

For more information on companies in this article

Related Content

  • Huge investment for Moscow’s motorway routes
    May 1, 2015
    Huge investments being made in building several outbound routes in Moscow and the Moscow region – Eugene Gerden writes. Up to US$20 billion (900 billion Roubles) will be invested in the building of several outbound routes in Moscow and the Moscow region during the next few years, according to an official spokesperson of the Russian Ministry of Transport. It is planned that the routes will be built as flyovers above the railroad tracks in the Yaroslavl, Kazan, Riga and Paveletskaya directions of the
  • Metro Pacific Tollways starts work on Cebu-Cordova Link bridge
    July 10, 2018
    Metro Pacific Tollways has started construction of a toll bridge to connect Mactan island to mainland Cebu.
  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • Uganda-Kenya road link receiving funding
    August 29, 2018
    Improvements to a key road link connecting Uganda with Kenya will benefit from a financing package provided by the African Development Bank (AfDB). The 73km section of road connecting Kapchorwa in Uganda with Suam in Kenya will receive US$105 million of funding. This will help improve trade and transport between the two nations.