Skip to main content

Bangladesh infrastructure – funding offer

Financing now looks to be secured for two major infrastructure projects in Bangladesh. The US$300 million Tamabil to Sylhet highway looks likely to receive a funding package from the Asian Infrastructure Development Bank (AIIB) in China. The feasibility study for the Shambhuganj Bridge also looks likely to receive funding from the AIIB.
July 2, 2018 Read time: 1 min

Financing now looks to be secured for two major infrastructure projects in Bangladesh. The US$300 million Tamabil to Sylhet highway looks likely to receive a funding package from the Asian Infrastructure Development Bank (AIIB) in China. The feasibility study for the Shambhuganj Bridge also looks likely to receive funding from the AIIB.

Related Content

  • Bangladesh highway contract awarded
    July 9, 2021
    A key Bangladesh highway contract has been awarded.
  • World Bank cancel US$1.2bn Padma Bridge loan
    July 6, 2012
    A loan worth US$1.20billion for the Padma Multipurpose Bridge project has been cancelled by the World Bank (WB). The decision was said to have been taken as the Bank was not satisfied with the actions taken by the Bangladeshi government in regards to corruption allegations involving the bridge contract. A major engineering and construction company is alleged to have made improper payments to Bangladeshi government officials in order to secure the bridge contract. The World Bank loan, signed In April last y
  • Sri Lanka port road for capital
    September 17, 2019
    Construction work is underway for a new road link to Sri Lanka’s port at Colombo.
  • Bangladesh airport link project
    November 3, 2017
    A new highway is planned in Bangladesh that will improve transport links to Dhaka’s airport. The route will run between Ashulia on the north-eastern side of the Bangladesh capital and Hazrat Shahjalal International Airport. The construction project is intended to boost trade and transport and is expected to cost US$2.06 billion. The Bangladesh Government is giving its approval for the project and will provide $725.3 million of the financing required from its own budget.