Skip to main content

Autostrade del Lazio awards Sacyr company SIS the Roma-Latina deal

SIS, a subsidiary of Spanish contractor Sacyr, has won a €2.8 billion contract to build and operate the 186km Roma-Latina motorway in Italy. Autostrade Del Lazio, a public company created to build and manage the motorway, awarded the public private partnership contract, officially called Corridoio intermodale Roma-Latina e collegamento Cisterna-Valmontone. The SIS Scpa consortium, which consists of Sacyr (49%) and Fininc di Torino (51%), will build-operate-maintain the highway over 50 years. Revenue i
July 15, 2016 Read time: 1 min
SIS, a subsidiary of Spanish contractor 3959 Sacyr, has won a €2.8 billion contract to build and operate the 186km Roma-Latina motorway in Italy.

Autostrade Del Lazio, a public company created to build and manage the motorway, awarded the public private partnership contract, officially called Corridoio intermodale Roma-Latina e collegamento Cisterna-Valmontone.

The SIS Scpa consortium, which consists of Sacyr (49%) and Fininc di Torino (51%), will build-operate-maintain the highway over 50 years. Revenue is likely to be around €12.25 billion.

SIS was in competition with 7809 Salini Impregilo for the project that will include 78 viaducts, two tunnels, 17 junctions and three tolling areas. Around 32,000 vehicles are expected to use the motorway daily.

Sacyr Concesiones is already operating the 145km Pedemontana-Veneta motorway now under construction and which will need an investment of €2.5 billion, according to a report in the Spanish newspaper Cinco Dias.

For more information on companies in this article

Related Content

  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Bids for Višňové Tunnel's IT being evaluated
    March 31, 2023
    The contract, in Slovakia, also includes IT equipment for the D1 motorway stretch Lietavska Lucka - Visnove - Dubna Skala of which the tunnel is a part.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.