Skip to main content

Austria-Slovenia tunnel project awarded

Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
August 9, 2018 Read time: 1 min
Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft.


The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as well as installing the latest fire protection facilities and communication systems.

Construction of the first tunnel commences in 1986 and this was opened to traffic in 1991. The tunnel links the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana. The road tunnel forms part of the transport axis Munich-Salzburg-Ljubljana-Thessaloniki, also called Pan-European Corridor-X.

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Chinese firm wins highways expansion project to decongest Nairobi
    January 5, 2017
    A Chinese contractor is carrying out a major road project intended to cut congestion in Kenyan capital Nairobi – Shem Oirere writes Chinese contractor China Wu Yi has won a US$163 million contract for the reconstruction and expansion of a 25km highway leading out of Kenya’s capital Nairobi with financing from the World Bank. The contract was awarded by the country’s National Highways Authority (KeNHA), a state-owned road agency responsible for the management, development, rehabilitation and maintenance of i