Skip to main content

Austria-Slovenia tunnel project awarded

Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
August 9, 2018 Read time: 1 min
Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft.


The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as well as installing the latest fire protection facilities and communication systems.

Construction of the first tunnel commences in 1986 and this was opened to traffic in 1991. The tunnel links the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana. The road tunnel forms part of the transport axis Munich-Salzburg-Ljubljana-Thessaloniki, also called Pan-European Corridor-X.

Related Content

  • A Chinese loan will help develop Macedonia’s roads
    December 4, 2012
    A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
  • Brussels road tunnel project complete
    March 1, 2022
    Construction work is complete on a key Brussels road tunnel project.
  • Slovakia’s D1 highway project underway
    August 11, 2022
    Work on Slovakia’s D1 highway project is underway.
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The