Skip to main content

Austria-Slovenia tunnel project awarded

Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
August 9, 2018 Read time: 1 min
Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft.


The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as well as installing the latest fire protection facilities and communication systems.

Construction of the first tunnel commences in 1986 and this was opened to traffic in 1991. The tunnel links the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana. The road tunnel forms part of the transport axis Munich-Salzburg-Ljubljana-Thessaloniki, also called Pan-European Corridor-X.

Related Content

  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an
  • Serbia highway 50% complete
    January 14, 2025
    A key Serbian highway is 50% complete.
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Bridge under discussion for UK’s River Thames
    June 19, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.