Skip to main content

Austria road and tunnel development plans

Major road and tunnel development plans are being set out in Austria. The country’s road traffic management business, ASFINAG, has set a budget of €1.1 billion for new works to be carried out during 2018. A planned 50% of the budget will be utilised for building new roads or for tunnel works. The remaining 50% will be used to pay for necessary road repairs and maintenance works. In addition, Asfinag has set a budget of €100 million to introduce the latest toll collection systems.
February 16, 2018 Read time: 1 min

Major road and tunnel development plans are being set out in Austria. The country’s road traffic management business, 4178 ASFINAG, has set a budget of €1.1 billion for new works to be carried out during 2018. A planned 50% of the budget will be utilised for building new roads or for tunnel works. The remaining 50% will be used to pay for necessary road repairs and maintenance works. In addition, Asfinag has set a budget of €100 million to introduce the latest toll collection systems.

For more information on companies in this article

Related Content

  • Plans to upgrade Budapest’s historic bridge and tunnel links
    October 1, 2019
    Plans are in hand to upgrade the historic Lanchid Bridge and Varalgut Tunnel in Hungary’s capital, Budapest. However a shortage of available funds means that the improvement works to the tunnel may have to be delayed. Should it prove the case that funds are insufficient to meet the necessary costs, the work to the bridge will be prioritised. Rebuilding both the Lanchid Bridge and Varalgut Tunnel could cost from €104.64 million to €107.7 million according to estimates. The bridge work alone could cost as muc
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Road recycling developments coming to market
    March 22, 2017
    Major manufacturers are introducing new machines for road milling and recycling that will boost output and lower the cost/m - Mike Woof writes New machines for milling and road recycling will offer increased performance and productivity than earlier generation equipment. Higher quality cutting will help contractors achieve smoother surfaces and considerably lower paving costs also. Meanwhile new recycler/stabiliser machines will offer a better cost/m and improve the economics of road recycling for contra