Skip to main content

Atlanta SR 400 Express Lanes project awarded

The 20km project, awarded by the Georgia Department of Transportation in the US, went to the SR 400 Peach Partners, that includes ACS, Acciona and Meridiam.
By David Arminas September 2, 2024 Read time: 2 mins
Dragados USA and Acciona Construction USA will be responsible for the design and construction, while Acciona Concesiones and ACS Infrastructure Development will be in charge of maintenance (image courtesy ACS/SR 400 Peach Partners)

ACS and Acciona from Spain French infrastructure investment firm Meridiam will design, build, finance and operate the SR 400 Express Lanes project in Atlanta.

The 20km project, awarded as a public-private partnership model by the Georgia Department of Transportation, will take around six years to complete and is worth about US$8.65 billion.

Dragados USA and Acciona Construction USA will be responsible for the design and construction, while Acciona Concesiones and ACS Infrastructure Development will be in charge of maintenance.

According to GDoT, The project will add new express lanes in both directions along a 24km section of SR 400. Similar to the other operational Georgia Express Lanes facilities in the metro area, the new express lanes will have variable-priced tolling. There will also bje for the first time along the SR 400 bus rapid transit.

Construction is expected to start next year with completion in 2031.

The Georgia Department of Transportation (Georgia DOT) and the State Road and Tollway Authority (SRTA) together said that they had used “a best-value procurement method” for the project. The method scores both technical approach and financial proposals with SR 400 Peach Partners, which also includes civil construction firms Dragados and Parsons.

The private sector partner will incentivise the use of the express lanes over the 50-year partnership. Toll rates will be subject to the tollway authority’s contractual requirements. The SR 400 Express Lanes will operate with the use of a Peach Pass transponder or another interoperable transponder. Customer billing will be performed by the tolling authority as it is with the four express lanes facilities currently operational in Georgia.

The SR 400 Express Lanes will be part of the larger Georgia Express Lanes Network.

For a short video presentation by SR 400 Peach Partners, click here.

For more information on companies in this article

Related Content

  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.
  • Ferrovial picks up more North Tarrant Express work in Texas
    August 23, 2019
    Ferrovial, through a consortium led by its toll road subsidiary Cintra Infraestructuras, will build and operate an extension to the North Tarrant Express in Texas. Ferrovial Agroman will be in charge of designing and building the 11km road, known as segment 3C in a deal worth US$910 million. The consortium, NTE Mobility Partners Segments 3, includes the Meridiam fund and APG, a specialised pension fund management firm. It runs from Heritage Trace Parkway, north of US 81/287, to Eagle Parkway in Denton
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.