Skip to main content

Atkins sells stake in London’s M25 ring road

Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
December 14, 2016 Read time: 2 mins
Infrastructure engineering firm WS 3005 Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million).

Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins.

In October, the Edge Orbital consortium picked up 2296 Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska sold for around €315 million (£265 million). 1146 Balfour Beatty and 2643 Egis remain shareholders in Connect Plus.

The 188km M25 was completed in 1986 and is Europe’s second longest urban orbital road, only 10km shorter than the Berliner Ring in Germany. Most of the road was built as a dual three-lane motorway but many sections have been widened. Around half is now dual four-lane with some dual five and dual six.

Daily traffic volumes have reached at times nearly 200,000 vehicles.

In May 2009, the UK’s government 2309 Highways Agency – now 8100 Highways England - awarded Connect Plus a 30-year design-build-finance-operate contract to manage the M25 and key arterial link roads. The contract included the now-completed widening of the M25 to four lanes between Junctions 16 and 23 and between Junctions 27 and 30, as well as refurbishment of the Hatfield Tunnel on the A1(M) motorway running north from London.

Connect Plus is also delivering other major improvements, including widening around 45km of the M25, refurbishing tunnels and bridges and installing hundreds of variable messaging signs (VMS) and gantries.

For more information on companies in this article

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • UK’s A14 widening project ramps up with a recruitment drive
    November 11, 2016
    Contractors are gearing up for one of the UK’s largest road projects, the 34km widening of the A14 between the town of Huntingdon and city of Cambridge. The €1.7 billion government-funded scheme will be delivered over four years by a joint venture between Skanska, Costain, Balfour Beatty and Carillion.
  • Balfour Beatty wins €225mn UK motorway upgrade contract
    June 23, 2014
    Balfour Beatty has won a €225 million (£184 million) motorway upgrade contract from the Highways Agency. A total of 27.3kms (17 miles) on the M60 and M72 will be upgraded. The work includes converting the carriageway between junctions 18 and 20 on the M72 to a four-lane motorway. The carriageway stretch between junctions 8 and 12 on the M60 will also be upgraded. Employing around 1,000, the work is due to begin this month (July 2014) and be completed by autumn 2017.
  • VIDEO: Balfour starts M3 bridge upgrade in UK following demolition
    November 23, 2016
    Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.