Skip to main content

Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala

Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
March 3, 2016 Read time: 3 mins
1324 Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala.

The contract, awarded by the 3519 Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E 77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

Astaldi’s other infrastructure contracts includes metros in Milan, Genoa, Warsaw and in Caracas, Venezuela, as well as the high-profile Large Electron-Positron Collider for CERN, Switzerland.

Last year, Italian firm 7809 Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of 2017. Meanwhile, a consortium headed by 3302 Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a 945 Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

Astaldi announced last month that, as part of the Consortium ACe, it had won the design and construction contract for the dome and main structure of the European Extremely Large Telescope. The E-ELT will be built in Chile on the Cerro Armazones, in the central part of the Atacama desert, at 3,000m above sea level. Consortium ACe comprises Astaldi (65%, leader) and Cimolai (35%), with EIE Group, an international leader in management, design and production in the fields of astronomy and astrophysics.

Related Content

  • Poland tenders for Czestochowa A1 motorway section
    June 18, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed
  • Polish island tunnel connection planned
    February 7, 2017
    The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
  • New Polish road projects planned
    March 19, 2021
    New Polish road projects are now being planned.
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.