Skip to main content

Astaldi wins contract for part of Romania’s Brasov–Oradea motorway

Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
April 19, 2016 Read time: 2 mins
Italian contractor 1324 Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania.

The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest.

Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months.

Work on the Brasov-Oradea section – also known as the Transylvania Motorway - has been dogged by contract and financial disputes for more than a decade.

The entire section was originally scheduled to be built by the American company 4138 Bechtel Corporation with 5252 Enka of Turkey. The contract was awarded in 2004 but without an open bidding process. Costs rose from €2.8 billion in 2003 to an estimated €4.7 billion by 2007 estimate. Bechtel’s work has since then been reduced.

Three-quarters of the cost for Astaldi’s deal is coming from European funds and the remaining 25% by the federal government.

Astaldi will carry out the works as leader of a joint venture established with German construction firm Max Bogl. Together they had a 48.5% stake in the project. Astaldi has worked with Bogle before in Romana, including on the Lia Manoliu National Stadium in Bucharest, completed in 2012.

Astaldi Group has been active in Romania for more than 20 years and has built more than 250km of roads and motorways, including the Piata Sudului road underpass, as well as the A1-Curiel expressway. Astaldi has also built two international airports - Henri Coanda in  Bucharest and Avram Iancu in Cluj-Napoca.

For more information on companies in this article

Related Content

  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Bucharest win for Aktor-Eurocontsruct
    October 27, 2021
    Lot 3 of the Bucharest south ring road is worth around €173.76 million.
  • Bechtel-Enka win North Macedonia deal
    March 21, 2023
    The US-Turkish joint venture will build four sections of the European Corridors VIII and X in the Balkan country north of Greece.
  • Mott MacDonald to design highway improvements in Czech Republic
    August 6, 2015
    Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.