Skip to main content

Another bridge over the River Drina

Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
By David Arminas October 29, 2020 Read time: 2 mins
March opening likely for Bratoljub Bridge (photo courtesy of newspaper Nezavisne Novine)

The Bratoljub Bridge between Serbia and the autonomous Bosnian entity of Republika Srpska is set to open in March after years of delays.

Local media reported that Radovan Viskovic, prime minister of the Republika Srpska, announced the date.

News reports in mid-2016 said Serbia’s ministry of construction announced that the bridge was soon to be completed, at a cost of around €13 million. Serbia reportedly was building the entire two-lane 227m-long bridge that will also have a cycle and pedestrian lane on each side.

The bridge connects the Serbian town of Ljubovija and the town of Bratunac in Republika Srpska on the Bosnian side of the River Drina.

The process for agreeing a new bridge over the Drina  began in 2013 and was formalised in 2016 for construction to start soon after. Although the bridge was mostly built, the project stalled over construction of the connecting roads on each side of the structure.

On the Bosnian side, the government of the Federation of Bosnia and Herzegovina was to build the border crossing within the municipality of Bratunac in Republika Srpska, a constituent part of federated Bosnia and Herzegovina. Meanwhile, the government of  Republika Srpska was to build the access road to the bridge.

Disagreements between the Bosnian government and that of Republika Srpska delayed construction work.

Media reported that the contractor has been MBA-Ratko Mitrović Civil Engineering, based in the Serbian capital Belgrade, and the project was led by the Traffic Institute CIP Belgrade, also in Belgrade.

Related Content

  • SSL settles legal issues, Champlain Bridge to open December 21
    April 18, 2018
    Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Serbia secures €13bn for road and other infrastructure projects
    February 21, 2014
    A total of €13 billion has been secured for investments in Serbian road and other infrastructure projects, according to Serbia’s president and minister of transport, Velimir Ilic. President Ilic said that the funding will be used for construction of the road Corridor 11, between Belgrade and Pozega, the continuation of works between Pozega to Boljare in Montenegro, and the connection of Valjevo with Corridor 11, including further works through Ljubovija and Bratunac. He also said that the multi-million eur
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.