Skip to main content

Another bridge over the River Drina

Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
By David Arminas October 29, 2020 Read time: 2 mins
March opening likely for Bratoljub Bridge (photo courtesy of newspaper Nezavisne Novine)

The Bratoljub Bridge between Serbia and the autonomous Bosnian entity of Republika Srpska is set to open in March after years of delays.

Local media reported that Radovan Viskovic, prime minister of the Republika Srpska, announced the date.

News reports in mid-2016 said Serbia’s ministry of construction announced that the bridge was soon to be completed, at a cost of around €13 million. Serbia reportedly was building the entire two-lane 227m-long bridge that will also have a cycle and pedestrian lane on each side.

The bridge connects the Serbian town of Ljubovija and the town of Bratunac in Republika Srpska on the Bosnian side of the River Drina.

The process for agreeing a new bridge over the Drina  began in 2013 and was formalised in 2016 for construction to start soon after. Although the bridge was mostly built, the project stalled over construction of the connecting roads on each side of the structure.

On the Bosnian side, the government of the Federation of Bosnia and Herzegovina was to build the border crossing within the municipality of Bratunac in Republika Srpska, a constituent part of federated Bosnia and Herzegovina. Meanwhile, the government of  Republika Srpska was to build the access road to the bridge.

Disagreements between the Bosnian government and that of Republika Srpska delayed construction work.

Media reported that the contractor has been MBA-Ratko Mitrović Civil Engineering, based in the Serbian capital Belgrade, and the project was led by the Traffic Institute CIP Belgrade, also in Belgrade.

Related Content

  • Bosnia highway plan
    March 3, 2021
    Work is being planned on a key Bosnian highway.
  • Montenegro on the ropes over China deal
    April 13, 2021
    The first 41km of highway cost €20 million per kilometre - one of the most expensive highways in the world.
  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • CT Ictas and Astaldi submit complaint over Peljeski Bridge award
    February 14, 2018
    Croatian media are reporting a dispute between two consortia and that of the China Road and Bridges over the Peljeski bridge project. Croatia’s national roads company Hrvatske Ceste chose China Road and Bridges but the decision is being challenged by a consortium led by the Italian firm Astaldi and one by Turkish CT Ictas. The two consortia submitted their complaints to the Croatian State Commission for Control of Public Ordering Processes in January only days after similar action by another consortia led