Skip to main content

Another bridge over the River Drina

Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
By David Arminas October 29, 2020 Read time: 2 mins
March opening likely for Bratoljub Bridge (photo courtesy of newspaper Nezavisne Novine)

The Bratoljub Bridge between Serbia and the autonomous Bosnian entity of Republika Srpska is set to open in March after years of delays.

Local media reported that Radovan Viskovic, prime minister of the Republika Srpska, announced the date.

News reports in mid-2016 said Serbia’s ministry of construction announced that the bridge was soon to be completed, at a cost of around €13 million. Serbia reportedly was building the entire two-lane 227m-long bridge that will also have a cycle and pedestrian lane on each side.

The bridge connects the Serbian town of Ljubovija and the town of Bratunac in Republika Srpska on the Bosnian side of the River Drina.

The process for agreeing a new bridge over the Drina  began in 2013 and was formalised in 2016 for construction to start soon after. Although the bridge was mostly built, the project stalled over construction of the connecting roads on each side of the structure.

On the Bosnian side, the government of the Federation of Bosnia and Herzegovina was to build the border crossing within the municipality of Bratunac in Republika Srpska, a constituent part of federated Bosnia and Herzegovina. Meanwhile, the government of  Republika Srpska was to build the access road to the bridge.

Disagreements between the Bosnian government and that of Republika Srpska delayed construction work.

Media reported that the contractor has been MBA-Ratko Mitrović Civil Engineering, based in the Serbian capital Belgrade, and the project was led by the Traffic Institute CIP Belgrade, also in Belgrade.

Related Content

  • Bosnia gets €750 million loan for Corridor 5C motorway
    March 1, 2018
    Bosnia has signed a European loan agreement worth €750 million for several sections of work on the Corridor 5V motorway project. Denis Zvizdic, head of government for Bosnia and Herzegovina, said the deal was signed in London during a recent investment conference on the western Balkans. Of the loan amount, the Federation of Bosnia and Herzegovina will get €500 million and the internal but autonomous Republika Srpska will receive €250 million. The money will be used for constructing four 70km sections of
  • Six years for Belgrade-Novi Sad highway
    September 17, 2024
    Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.