Skip to main content

ANI transfers operation of Guillermo Gaviria Correa to Mar 1 Devimar

The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI). ANI will, in turn, cede the concession to the Mar 1 Devimar consortium. The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for
July 6, 2016 Read time: 2 mins
The Colombian department of Antioquia has transferred operation of the Guillermo Gaviria Correa road connection to the National Infrastructure Agency (ANI).

ANI will, in turn, cede the concession to the Mar 1 Devimar consortium.

The road, named after the assassinated governor of Antioquia, runs between the municipalities of Medellin and San Jerónimo and connects Medellin to the Uraba Gulf, part of the Caribbean Sea. Gaviria, a Nobel Peace Prize nominee, was kidnapped by guerrillas and held captive for a year before being among 10 people killed in 2003 in response to an attempted military rescue.

In operation since 2007, the highway, in combination with the Fernando Gómez Martínez tunnel – the longest tunnel in South America - has done away with the curvy roads once commonplace in the tourist areas of Santa Fé de Antioquia, San Jerónimo and Sopetrán.

The Mar 1 Devimar consortium will soon start construction of the Mar 1 motorway, one of the main projects included in the federal government's 4G Roads Programme. The contract for construction of the 176km Mar 1 was awarded in 2015. The road will connect with the El Toyo tunnel and Mar 2 motorway at a cost of around US$500 million. Work will include construction of 17 tunnels and 41 bridges, as well as a second lane in the Medellin-Santa Fe section and refurbishment of Bolombolo-Santa Fe section.

Meanwhile, the president of the National Infrastructure Agency (ANI), Luis Fernando Andrade, said that there is a six-month delay in achieving financial closures for the first phase of the government's 4G Road Programme. There are, however, 12 projects in the first stage of the process, which involves letters of commitment delivered to ANI by the investors.

Andrade said that financial closures for the remaining projects are likely to be ready in the near future, apart from the Mulalo-Loboguerrero motorway in Valle del Cauca department.

Related Content

  • Columbia looks for more funding of 4G motorway projects
    April 15, 2015
    Colombia's national agency for infrastructure, Agencia Nacional de Infraestructura (ANI), has announced the second wave of 4G motorway projects made of nine projects that will require US$5.64 billion. Four proposals were received for the first of these projects, the Puerta de Hierro-Palmar de Varela-Cruz del Vizo motorway, a 202km road will require around $470 million. L:ast November World Highways reported that a major programme of PPP road construction concession contracts is due for Colombia. It wa
  • Colombia tunnel building work
    May 27, 2020
    Excavation work will be complete on a new tunnel stretch in Colombia in Q3 2020.
  • Colombia to gain access to US$400 million loan from CABEI
    April 27, 2015
    Colombia's finance minister Mauricio Cardenas said the country will gain access to a loan of US$400 million the Central American Bank for Economic Integration (CABEI) for infrastructure projects. Around $200 million will finance 4G motorway concessions. The rest will be used on projects that involve CABEI founding members such as Nicaragua, El Salvador, Costa Rica, Honduras and Guatemala. The announcement was made during the 55th CABEI governors’ assembly in Medellin, Columbia, in April. Colombia has
  • Colombia dual carriageways under construction
    October 10, 2016
    Colombia is currently working on major highway projects that will improve transport infrastructure in the country and form part of its 4G programme. The US$616.5 million Rumichaca-Pasto dual carriageway in Narino department will improve Colombia’s transport connections with neighbouring Ecuador, cutting journey times from two hours at present to just one hour. The project is being handled by a consortium, Consorcio SAC 4G and involves improving an 80km road section and building additional lanes for the 74km