Skip to main content

Alberta eyes La Crete Ferry replacement

The Canadian province is considering a toll bridge over the Peace River.
By David Arminas September 2, 2020 Read time: 2 mins
The La Crete Ferry is 33.4m long, carries two crew members, 60 passengers and 14 mid-size cars (photo: Alberta Transportation)

Alberta is considering replacing a ferry service with what would be the Canadian province’s first toll bridge.

The La Crete Ferry at Tompkins Crossing on provincial Highway 697 shuttles vehicles across the 0.7km wide Peace River. The crossing is in a remote location near the town of La Crete, population around 2,500 and about 700km north of the provincial capital Edmonton.

Alberta Transportation said on its website that now other tolls across the province are being considered.

This bridge – expected to cost around US$152 million – “would replace the winter ice road crossing and aging seasonal ferry”, noted the department. The 33.4m-long flat-bottom ferry was built in1987 and carries two crew members, 60 passengers and 14 mid-size cars.

“Seasonal crossings are closed 30% of the year and are often disrupted by poor weather and wait times of up to three hours during peak periods. A reliable year-round bridge would reduce travel times and congestion, improve trade movements and attract investment to the region.”

The cost of the bridge is not in the province’s 2020-23 Capital Plan. “A new financing approach using road user fees could allow this project to proceed during this time of fiscal challenges. Road user fee systems exist in five [other] provinces and territories.”

Alberta Transportation has gone out to public consultation on the project. “Feedback will help us determine support for building this project through alternative financing and how road user fees could be implemented for the project,” it said.

For more information on companies in this article

Related Content

  • Property issues holding back start of work on Gordie Howe Bridge
    July 19, 2016
    Delays in buying properties in Detroit, Michigan, could hold up construction of the proposed 3.2km Gordie Howe International Bridge that will link the US city to Windsor in Canada. A report by the Detroit Free press said that around 30 of the estimated 900 parcels of land in the city’s Delray district could pose potential problems if owners resist selling the sites to the bridge’s developers. The newspaper noted that Dwight Duncan, interim chair of the Windsor-Detroit Bridge Authority - the Canadian e
  • Lafarge picks up Vancouver runway deal
    January 24, 2025
    Lafarge Canada will be a subcontractor to Kiewit and in charge of asphalt paving for Vancouver International’s North Runway project.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • SSL settles legal issues, Champlain Bridge to open December 21
    April 18, 2018
    Montreal will get its new Champlain Bridge just before Christmas, a date agreed upon by the Canadian government and the SNC-Lavalin-led consortium. The agreement settles an outstanding lawsuit that the Consortium had filed regarding costs increases of around US$186.5 million relating to the transportation of oversized parts and delays to the bridge's construction, according to media reports. Last month SNC-Lavalin, head of the Signature on the Saint-Laurent Group (SSL), had said that the bridge over the