Skip to main content

Alberta eyes La Crete Ferry replacement

The Canadian province is considering a toll bridge over the Peace River.
By David Arminas September 2, 2020 Read time: 2 mins
The La Crete Ferry is 33.4m long, carries two crew members, 60 passengers and 14 mid-size cars (photo: Alberta Transportation)

Alberta is considering replacing a ferry service with what would be the Canadian province’s first toll bridge.

The La Crete Ferry at Tompkins Crossing on provincial Highway 697 shuttles vehicles across the 0.7km wide Peace River. The crossing is in a remote location near the town of La Crete, population around 2,500 and about 700km north of the provincial capital Edmonton.

Alberta Transportation said on its website that now other tolls across the province are being considered.

This bridge – expected to cost around US$152 million – “would replace the winter ice road crossing and aging seasonal ferry”, noted the department. The 33.4m-long flat-bottom ferry was built in1987 and carries two crew members, 60 passengers and 14 mid-size cars.

“Seasonal crossings are closed 30% of the year and are often disrupted by poor weather and wait times of up to three hours during peak periods. A reliable year-round bridge would reduce travel times and congestion, improve trade movements and attract investment to the region.”

The cost of the bridge is not in the province’s 2020-23 Capital Plan. “A new financing approach using road user fees could allow this project to proceed during this time of fiscal challenges. Road user fee systems exist in five [other] provinces and territories.”

Alberta Transportation has gone out to public consultation on the project. “Feedback will help us determine support for building this project through alternative financing and how road user fees could be implemented for the project,” it said.

For more information on companies in this article

Related Content

  • Finland ploughs ahead with a planned Hailuoto causeway
    May 8, 2018
    Finland’s planned 8km Hailuoto Causeway is likely to cost around €74 million, according to the North Ostrobothnia Centre for Economic Development, Transport and the Environment.
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk