Skip to main content

Adani-led consortium wins Chhattisgarh highway project

A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
April 10, 2018 Read time: 1 min
A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the 292 National Highways Authority of India.


Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity.

The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH-111, along with construction of a paved shoulder.

The deal is the Adani Group's first project in transport infrastructure, according to a report by India’s Business Standard newspaper.

For more information on companies in this article

Related Content

  • Elonroad’s electric road and recharging lane for buses in Lund
    April 17, 2019
    Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
  • Four-lane India highway project secured by IRB Infrastructure
    April 30, 2014
    The National Highways Authority of India has awarded a US$529.67 million (INR 32 billion) Yedeshi-Aurangabad NH21 four-lane highway project in India to India-based IRB Infrastructure Developers (IRB Infrastructure). With a concession period of 26 years, the project is scheduled for completion in 910 days.
  • Road and bridge projects planned for India’s Gujarat State
    October 13, 2017
    A series of road projects are planned for India’s Gujarat State, with the work including the construction of a major new bridge. In all the work is expected to cost US$913.5 million. One key portion of the planned work is for the widening the 201.3km stretch of the NH-47 highway running from Ahmedabad to Rajkot to six lanes. The 116.2km NH-51 route from Porbandar to Dwarka will be widened to four lanes. A new cable-stayed bridge will be built from Okha to Beyt Dwarka on the NH-51 route.
  • Indian expressway secures funding
    October 12, 2022
    An Indian expressway project has secured necessary funding.